Use this checklist to prepare for a kitchen, bathroom, or commercial restroom renovation in Middle Tennessee or Southern Kentucky. Record what you know, mark unknowns as unknown, and bring open questions to the project professional or responsible local authority. This is a planning aid, not an inspection, quote, hazard assessment, code determination, or confirmed schedule.
1. Identify the property, room, and scope
- Property and location: write the street address or general area, city or county, suite or unit, floor, and room name. If the project covers several rooms or sites, list each separately.
- Project type and scope: mark kitchen, bathroom, commercial restroom, or more than one. Describe what you are considering changing, what should remain, and any related areas that may be affected.
- Goals and priorities: rank the needs that matter most, such as layout, storage, fixtures, finish, durability, cleaning, appearance, access, or keeping part of the space usable. Separate must-haves from options.
- Property use: note whether the space is owner-occupied, rented, tenant-occupied, customer-facing, staff-only, or used another way. Record who uses it and the busiest periods.
- Project contact: identify the person preparing this checklist and the best way for the project team to follow up. Keep door codes and other credentials out of a general project note.
2. Record known conditions and documents
Write down observations and records you already have. Do not open walls, lift flooring, take samples, or disturb suspect materials just to complete this form. The practical preparation suggestions in the supplied research came mainly from secondary sources; they are prompts for discussion, not local standards.
- Building age or approximate year built: __________ If unknown, write “unknown.”
- List repairs, recurring issues, leaks, staining, dampness, musty odors, or visible moisture you know about. Note where and when they occurred, any response already made, and what remains uncertain.
- Record known plumbing, electrical, ventilation, flooring, or structural concerns as reported or observed. Separate what you saw from a suspected cause; do not diagnose hidden conditions.
- Gather existing plans, prior inspection reports, repair records, product information, and any lead or asbestos surveys already available. Note who prepared each record and its date if known.
- If a material may be affected by the planned work, ask a qualified professional whether an evaluation or testing is appropriate for that property and scope. EPA recommends qualified asbestos evaluation when suspect material is damaged or would be disturbed; this is not a blanket testing requirement for every renovation.
- For a commercial restroom, describe existing accessible features and any known barriers on the route. Leave any decision about applicable accessibility provisions to the responsible authority or a qualified accessibility professional.
3. Add labeled photos and approximate measurements
- If useful, take a wide photo of the whole room and closer photos of the fixtures, finishes, damage, or areas in the proposed scope. Add a short label to each photo so the project team knows what it shows. Photos are an optional planning aid, not an inspection.
- If you already have dimensions, record approximate room width, length, ceiling height, openings, and fixture locations. Label every dimension “approximate” and note how it was measured; do not delay professional field measurements or treat your notes as construction dimensions.
- Attach an existing sketch, plan, fixture list, or product information if available. Mark anything missing as unknown rather than estimating a hidden or inaccessible dimension.
4. Plan around people, access, and occupancy
- For homes, note household routines, pets if relevant to access planning, and any time the room must remain available. For businesses, list operating hours, busy periods, tenant or customer needs, and any alternate restroom arrangements under consideration.
- Describe entry and delivery conditions: check-in, loading area, parking, stairs or elevators, route through the property, staging space, security procedures, and areas that need protection. Do not share access credentials here.
- List people who may need to coordinate: owner, decision-maker, property manager, tenant or operator, facilities contact, and project professional. Note who can approve scope, finishes, access, spending, or changes, and which approvals are still pending.
- Add a preferred timing window and dates to avoid. Treat these as preferences to discuss, not a confirmed start date, duration, or appointment.
5. Protect the work area and plan for disruption
- Before work starts, discuss what should be removed from the room, such as dishes, toiletries, furniture, personal items, and movable equipment.
- Ask which floors, fixtures, furnishings, and adjacent rooms should be covered or cleared. Dust and debris may travel beyond the room being renovated; agree with the project team on protection and cleanup for the actual site.
- Plan for noise, dust, deliveries, and periods of limited or no access to the work area. Ask how occupants, tenants, staff, or customers will be informed and what routes or facilities remain available.
- Ask the responsible qualified professional who will identify and isolate any water, gas, or electrical service before work that may affect it, and when that will happen. Utility shutoff procedures are an unverified project-specific prompt; do not operate unfamiliar shutoffs yourself.
6. Compare estimates and clarify trade responsibilities
- Where practical, compare more than one written estimate. Check that each describes a similar scope, materials or allowances, exclusions, site assumptions, cleanup, anticipated sequence, and payment terms before comparing totals.
- Ask each contractor which trades will perform the work, who supervises them, and what qualifications, insurance, or licenses apply to those trades and this location. Verify applicable credentials with the relevant authority; do not assume one credential applies to every project.
- Ask who will take final field measurements, confirm product quantities, order materials, arrange delivery, receive and inspect items, provide storage, and handle returns or restocking. Write down responsibilities that are not included in an estimate.
- Treat proposed dates, durations, and pricing as estimates until the project professional confirms them for the site and scope.
7. Coordinate measurements, materials, and deliveries
- Ask when the project professional will verify measurements and whether any site conditions could change quantities or product selections.
- Confirm who will order each item, the expected lead time, delivery date or window, receiving contact, unloading route, and a dry or secure place to store it.
- Agree how delivered items will be checked for damage, wrong sizes, missing pieces, or color and finish differences, and who will arrange exchanges or returns. Ask about return deadlines or restocking terms before ordering.
- If you plan to order any materials yourself, discuss measurements, compatibility, delivery access, storage, and return responsibility with the project professional first. The research treats owner ordering as an option, not a recommendation for every project.
8. Bathroom moisture questions for Middle Tennessee projects
The supplied secondary research flags humid Middle Tennessee conditions as a reason to discuss moisture management early. These are product and installation questions for the bathroom professional, not installation instructions or a promise of mold prevention, waterproofing, or damage-free performance.
- Ask whether the bathroom exhaust fan is appropriately sized for the room and whether its duct discharges outdoors, not into an attic. Ask the installer to confirm the proposed route and equipment for this building.
- Ask whether a timer or humidity control would suit the fan and room, and how long it should run after bathing.
- Discuss which moisture-resistant wall materials and complete wall assembly are appropriate for each location. Ask how product instructions and any required waterproofing details will be followed.
- Discuss the shower-pan product and installation details with the project professional before the assembly is covered. Do not assume that a material choice alone prevents water damage.
- If hardwood is being considered, ask how subfloor moisture will be assessed before installation and how the result will be compared with the flooring and adhesive manufacturers’ instructions.
- Porcelain tile is one moisture-resistant flooring option to discuss. It is not a universal prescription; suitability depends on the room, subfloor, full assembly, product instructions, and maintenance needs.
9. Confirm permits, inspections, shutoffs, and accessibility locally
The preparation research supplied for this guide found no Tennessee-specific pre-renovation inspection checklist and no Tennessee or Kentucky utility shutoff protocol. Do not treat any checklist item below as a universal permit, licensing, or inspection requirement. Ask the authority and qualified professionals responsible for the actual property and work.
- For Middle Tennessee, ask the local building or permitting authority which permits, plans, trade qualifications, utility coordination, and inspections, if any, apply to this address and scope. Ask who will arrange them and at what stage.
- If plumbing work is in Southern Kentucky, verify applicable plumbing licensing, plans or permits, and inspections with the Kentucky Division of Plumbing. Applicability depends on the work and property; use the Division’s current guidance for the project.
- Ask the project professional or local authority whether any rough-in inspection is needed before walls close, and whether a final inspection or other review applies. These are questions to confirm, not universal requirements asserted by this guide.
- For commercial restroom work, ask a qualified accessibility professional or responsible authority whether ADA §603 and other accessibility provisions apply to the specific facility and alteration. Confirm whether identification or directional signs to the nearest qualifying restroom are relevant under ADA §216.8; this guide does not determine compliance or signage obligations.
- Have the responsible professional identify who is authorized to shut off or restore water, gas, and electricity for the proposed work. No regional shutoff sequence was established in the supplied research.
10. Flag lead paint and other suspect materials for qualified review
- If the property is pre-1978 housing or a child-occupied facility and painted surfaces may be disturbed, ask whether the EPA Renovation, Repair and Painting (RRP) Rule applies to the property and scope.
- As scoped guidance to verify with the contractor and EPA, the supplied research identifies work disturbing more than 6 square feet of painted surface per room indoors, more than 20 square feet outdoors, and window replacement or demolition of painted surfaces. Applicability depends on the rule’s definitions and exceptions; these figures are not a blanket testing mandate.
- EPA says paint testing is not required by the RRP Rule. If testing is chosen to determine whether a surface contains lead-based paint, ask which qualified person and method are appropriate for the affected surface.
- If asbestos-containing material is suspected and could be disturbed, do not sample or remove it yourself. Ask a properly trained and accredited asbestos professional whether evaluation or testing is appropriate. This is a qualified-evaluation prompt, not a claim that testing is legally required before every renovation.
- Do not treat the age of a building or a visual guess as a test result. Add existing survey or evaluation records to the project file and ask the project professional how any unresolved concern affects scope and sequencing.
Evidence notes and limits
The supplied preparation research combined official EPA and ADA material with secondary articles about bathroom moisture, contractor coordination, and property protection. Full citations for several secondary articles were not included in the research excerpt. Their practical suggestions are therefore presented here as questions to discuss, not verified Middle Tennessee or Southern Kentucky standards. Photos, approximate measurements, trade comparisons, and utility shutoff coordination are planning prompts or assumptions; they are not official regional inspection guidance. Confirm project-specific facts, qualifications, and requirements with the responsible local authority and qualified professional.
Sources and further guidance
- Renovation, Repair and Painting (RRP) Program: ContractorsU.S. Environmental Protection Agency
- I’m remodeling my home. Do I need to be concerned about asbestos in the building materials?U.S. Environmental Protection Agency
- ADA Accessibility StandardsU.S. Access Board
- Chapter 6: Toilet RoomsU.S. Access Board
- Division of PlumbingKentucky Department of Housing, Buildings and Construction